This Saturdays mission was to weld in the rear right quarter panel. I first had to weld in the repair panel for the strengthener, build up new flanges on the inner wheel house etc.

The rusted lower part of the strenghtener.
Clamped for welding
New flanges.
Strenghthener welded in.
The panel clamped.
Welded.
At the end of the day. There is a lot to cleaning up left. But now it is time to move on!

Next step is to change the boot floor panels.